chargevu
1 of 1 available22 kW peakPLN (Indonesia)

PLN ULP Sukoharjo Kota

PLN ULP Sukoharjo Kota, , Jl Jenderal Sudirman, Jombor, Sukoharjo, ID

1 port · IDR2467/kWh ++

Ports at this station

  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
PLN ULP Sukoharjo Kota, , Jl Jenderal Sudirman, Jombor, 57521, Sukoharjo, Jawa Tengah, Indonesia
Total points
1
Coordinates
-7.67136, 110.83890
Last verified
2026-05-02

About this stop

This PLN-operated charging station in Sukoharjo, Indonesia, is best suited for local EV drivers who need a charge. It provides 22 kW peak AC charging through one tethered Type 2 connector. The station is currently operational.

At 22 kW peak, this is a slower AC charging speed. Expect to add about 10-15 miles of range per hour, depending on your vehicle. This makes it suitable for topping up while running errands or for EV charging in Sukoharjo, rather than a fast stop on a long road trip. The cost is IDR2467 per kilowatt-hour, with additional fees potentially applying.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN ULP Sukoharjo Kota.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN ULP Sukoharjo Kota.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB