chargevu
2 of 2 available50 kW peakTupinambá

Posto Jardim do Trevo

Avenida Benedito Campos, 109, Campinas, BR

2 ports

Ports at this station

  • CCS2

    2× · up to 50 kW

    Available

Station info

Address
Avenida Benedito Campos, 109, 13030-100, Campinas, São Paulo, Brazil
Total points
1
Coordinates
-22.93011, -47.07064
Last verified
2023-04-17

About this stop

Tupinambá operates Posto Jardim do Trevo, a charging site in Campinas, Brazil. It has one charging point capable of 50 kW peak power. The site uses a CCS (Type 2) connector. It is currently operational.

This station offers rapid charging for EV drivers. A 50 kW peak output can add about 100 miles of range to an average EV in roughly 30 to 40 minutes, depending on the vehicle's battery and charging curve. This makes it a practical stop for EV charging in Campinas when you need to add miles quickly rather than for a full overnight charge.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Posto Jardim do Trevo.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Posto Jardim do Trevo.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB