chargevu
2 of 2 available120 kW peakEDP

PRT*00253 Burger King

R. das Linhas de Torres 56 , Porto, PT

2 ports

Ports at this station

  • CCS2

    1× · up to 120 kW

    Available
  • CHAdeMO

    1× · up to 60 kW

    Available

Station info

Address
R. das Linhas de Torres 56 , Porto, Portugal
Total points
1
Coordinates
41.16981, -8.57156
Last verified
2025-01-25

About this stop

This EV charging station in Porto, PT, supports cars with CCS (Type 2) and CHAdeMO connectors. It is operated by EDP and offers 120 kW peak power.

At 120 kW, this is a rapid charging station. For context, adding approximately 100 miles of range can take around 20 minutes depending on the vehicle. This station is best suited for quick top-ups rather than extended stays. The station is currently reported as not operational.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PRT*00253 Burger King.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PRT*00253 Burger King.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB