chargevu
2 of 2 available180 kW peakIndependent

PSO Girja Chowk

Girja Chowk, Cantt, Lahore, PK

2 ports · 90

Ports at this station

  • CCS2

    1× · up to 180 kW

    Available
  • CCS2

    1× · up to 50 kW

    Available

Station info

Address
Girja Chowk, Cantt, Lahore, Punjab, Pakistan
Total points
1
Coordinates
31.52224, 74.37973
Last verified
2026-03-15

About this stop

PSO Girja Chowk is an EV charging station located in Lahore, Pakistan. This independent site has one charging point capable of 180 kW peak power. It provides CCS (Type 2) connectors and is currently operational. EV charging in Lahore includes this option for drivers.

At 180 kW peak, this station is an ultra-rapid charger. This means it can add approximately 150 miles of range to a compatible EV in about 20 minutes, depending on the vehicle. It is best suited for drivers needing a quick charge on the go rather than a full day’s top-up. The cost is 90, though the currency is not specified.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PSO Girja Chowk.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PSO Girja Chowk.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB