chargevu
12 of 12 available350 kW peakeVgo Network

Raley's Citrus Heights #239

7847 Lichen Dr, Citrus Heights, US

12 ports

Ports at this station

  • CHAdeMO

    6× · up to 100 kW

    Available
  • CCS1

    4× · up to 350 kW

    Available
  • CCS1

    2× · up to 100 kW

    Available

Station info

Address
7847 Lichen Dr, 95621, Citrus Heights, CA, United States
Access
24 hours daily
Website
evgo.com
Coordinates
38.70884, -121.31367
Last verified
2024-02-14

About this stop

Drivers needing to add up to 200 miles of range in 15 to 20 minutes can use the Raley's Citrus Heights #239 station. Operated by the eVgo Network, this site offers 350 kW peak power, supporting CCS (Type 1) and CHAdeMO connectors. The number of charging points is not specified.

This station is best suited for drivers needing a quick charge on longer journeys rather than a routine local top-up. A 350 kW peak means a compatible EV could gain roughly 3 miles of range per minute of charging, depending on the vehicle's capabilities and current battery level. It is operational for EV charging in Citrus Heights.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Raley's Citrus Heights #239.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Raley's Citrus Heights #239.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB