chargevu
3 of 3 available50 kW peak(Business Owner at Location)

Stadtwerke Nordhausen

Robert-Blum-Straße 1, Nordhausen, DE

3 ports · AC = 0,25 €/kWh | DC = 0,33 €/minute (ohne Umsatzsteuer)

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Available
  • CCS2

    1× · up to 50 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Robert-Blum-Straße 1, 99734, Nordhausen, Thüringen, Germany
Access
Im Virta ltd. Verbund - somit Anbindung an die Hubject Roaming Plattform.
Total points
2
Coordinates
51.48648, 10.79851
Last verified
2019-04-24

About this stop

This station offers CCS, CHAdeMO, and Type 2 (socket only) connectors. The CCS and CHAdeMO ports provide DC fast charging up to 50 kW peak. The Type 2 socket is for AC charging. Two charging points are available at this independent station in Nordhausen, Germany.

A 50 kW peak charging speed means most EVs can add around 100 miles of range in about 30 to 45 minutes. This makes it a viable option for local top-ups or a quick boost during EV charging in Nordhausen, rather than a primary road trip rapid stop. AC charging costs 0.25 € per kilowatt-hour. DC charging is priced at 0.33 € per minute, not including tax.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Stadtwerke Nordhausen.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Stadtwerke Nordhausen.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB