chargevu
9 of 9 available200 kW peakTotalEnergies (FR)

TotalEnergies - La Brède

Route des Grands Pins, Ayguemorte-les-Graves, FR

9 ports

Ports at this station

  • CCS2

    8× · up to 200 kW

    Available
  • Type 2

    1× · up to 22 kW

    Available

Station info

Address
Route des Grands Pins, 33640, Ayguemorte-les-Graves, Nouvelle-Aquitaine, France
Total points
8
Coordinates
44.69051, -0.50029
Last verified
2025-11-30

About this stop

This TotalEnergies station in Ayguemorte-Les-Graves, FR offers 8 charging points equipped with CCS and Type 2 connectors. Most EVs use CCS. Type 2 sockets are available for cars that require them. The station is currently operational.

This is a good option for EV charging in Ayguemorte-Les-Graves if you need a fast top-up. A 200 kW peak charging speed can add approximately 100 miles of range to an EV in about 10 to 15 minutes, depending on the vehicle's charging capabilities.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at TotalEnergies - La Brède.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of TotalEnergies - La Brède.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB