chargevu
0 of 2 available50 kW peakIndependent

Trillium - San Diego Metropolitan Transit System

4630 Ruffner St, San Diego, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
4630 Ruffner St, 92111, San Diego, CA, United States
Access
Fleet use only
Coordinates
32.82479, -117.15755
Last verified
2025-11-11

About this stop

Trillium at the San Diego Metropolitan Transit System is an independent EV charging site. It offers 50 kW peak rapid charging. Drivers can use CCS (Type 1) or CHAdeMO connectors. The number of charging points is not specified. This station is operational, contributing to EV charging in San Diego.

A 50 kW peak charge rate means you can add about 100 miles of range to a compatible EV in roughly an hour. This speed is best suited for a local top-up or a brief stop rather than a long road trip. It’s a practical option for drivers needing to replenish their battery while in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Trillium - San Diego Metropolitan Transit System.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Trillium - San Diego Metropolitan Transit System.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB