chargevu
2 of 2 available80 kW peakIndependent

UCS

Franciso Getulio Vargas 1130, Caxias do Sul, BR

2 ports · R$2,00

Ports at this station

  • CCS2

    2× · up to 80 kW

    Available

Station info

Address
Franciso Getulio Vargas 1130, Caxias do Sul, RS, Brazil
Total points
2
Coordinates
-29.16285, -51.15014
Last verified
2025-09-06

About this stop

This independent charging station at UCS in Caxias Do Sul, Brazil, provides 80 kW peak rapid charging. It has two charging points equipped with CCS Type 2 connectors. The station is currently operational.

An 80 kW peak charge rate means you can add approximately 100 miles of range to a compatible EV in about 20 to 30 minutes, depending on the vehicle and battery temperature. This makes it a good option for EV charging in Caxias Do Sul if you need a quick top-up. The reported cost is R$2,00.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at UCS.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of UCS.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB