chargevu
0 of 2 available50 kW peakChargePoint

UNITED POWER COAL CREEK 1

5 Gross Dam Rd, Golden, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
5 Gross Dam Rd, 80403, Golden, CO, United States
Access
24 hours daily
Coordinates
39.91935, -105.36089
Last verified
2025-11-11

About this stop

This ChargePoint station in Golden, US offers CCS (Type 1) and CHAdeMO connectors. It provides 50 kW peak charging power. The number of charging points is not specified.

With 50 kW peak power, this station is best for topping up your EV battery rather than a full charge, which could take an hour or more. For drivers needing EV charging in Golden, it's an operational site to add range quickly. Expect to add about 100 miles of range in an hour, depending on your vehicle and battery temperature.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at UNITED POWER COAL CREEK 1.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of UNITED POWER COAL CREEK 1.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB