chargevu
2 of 2 available175 kW peakEnel X

US 2;US 141

US 2;US 141, Odgers Location, Iron County, US

2 ports · $0.42/kWh

Ports at this station

  • CCS1

    1× · up to 175 kW

    Available
  • CHAdeMO

    1× · up to 75 kW

    Available

Station info

Address
US 2;US 141, Odgers Location, 49920, Iron County, Iron County, United States
Total points
1
Coordinates
46.09714, -88.35468
Last verified
2023-02-15

About this stop

Enel X operates this ultra-rapid EV charging station in Iron County. It has one charging point capable of 175 kW peak power. The station supports both CCS (Type 1) and CHAdeMO connectors. EV charging in Iron County includes this operational site.

With 175 kW peak power, this station is best for drivers needing a quick charge on a longer journey. A 175 kW charger can add about 150 miles of range to a compatible EV in roughly 20 minutes, depending on the vehicle's battery and charging speed. This makes it a practical stop for travelers or those needing a substantial top-up.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at US 2;US 141.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of US 2;US 141.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB