chargevu
0 of 2 available50 kW peakEVCS

US Bank Watsonville

655 Main St, Watsonville, US

2 ports

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
655 Main St, 95076, Watsonville, CA, United States
Website
evcs.com
Coordinates
36.91414, -121.76112
Last verified
2025-11-11

About this stop

This EVCS station in Watsonville offers CCS (Type 1) and CHAdeMO connectors, compatible with most American and Japanese electric vehicles. It provides rapid charging up to 50 kW peak. This charging rate means you can add around 100 miles of range to a typical EV in about 40 minutes, depending on the vehicle's battery and charging speed. It's a convenient option for EV charging in Watsonville, useful for quick top-ups or longer stops. While not the fastest available, 50 kW offers a practical balance for drivers needing to extend their range effectively. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at US Bank Watsonville.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of US Bank Watsonville.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB