chargevu
6 of 6 available240 kW peakchargeEV (MY)

AEON Mall Rawang

Kompleks Beli Belah AEON Anggun Rawang, Rawang, MY

6 ports · RM 1.60/kWh (DC 240 kW), RM 1.40/kWh (DC 60 kW), RM 1.00/kWh (AC)

Ports at this station

  • CCS2

    2× · up to 240 kW

    Available
  • CCS2

    2× · up to 60 kW

    Available
  • Type 2 (tethered)

    2× · up to 22 kW

    Available

Station info

Address
Kompleks Beli Belah AEON Anggun Rawang, 48000, Rawang, Selangor, Malaysia
Total points
3
Coordinates
3.31607, 101.53660
Last verified
2026-01-19

About this stop

chargeEV operates three charging points at AEON Mall Rawang. This site offers ultra-rapid 240 kW charging via CCS connectors. It also provides Type 2 tethered connectors for AC charging.

For drivers needing EV charging in Rawang, the 240 kW peak power can add approximately 200 miles of range in 15 minutes, depending on the vehicle. This station is best suited for quick top-ups rather than long-haul stops. Pricing varies by speed: RM 1.60 per kWh for 240 kW DC, RM 1.40 per kWh for 60 kW DC, and RM 1.00 per kWh for AC charging.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at AEON Mall Rawang.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of AEON Mall Rawang.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB