chargevu
3 of 3 available50 kW peakGALP Electric

AJT-00002 (Southbound)

A2 km 148 (Sentido Norte/Sul), Aljustrel, PT

3 ports · From 0.43€ / kWh

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Available
  • CCS2

    1× · up to 50 kW

    Available
  • Type 2 (tethered)

    1× · up to 43 kW

    Available

Station info

Address
A2 km 148 (Sentido Norte/Sul), 7600-000, Aljustrel, Portugal
Total points
2
Website
mobie.pt
Coordinates
37.92428, -8.24385
Last verified
2023-03-19

About this stop

This GALP Electric site in Aljustrel, Portugal, offers EV charging with two rapid points. Each station can deliver up to 50 kW peak power. Connectors available include CCS (Type 2), CHAdeMO, and a tethered Type 2 connector. The station is currently operational. This is a standard stop for EV charging in Aljustrel. A 50 kW peak means you can add approximately 100 miles of range to a compatible EV in about 30 to 40 minutes, depending on the vehicle's battery size and charging speed. It's suited for a quick top-up on a longer journey or a more substantial charge if needed locally.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at AJT-00002 (Southbound).

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of AJT-00002 (Southbound).

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB