chargevu
3 of 3 available110 kW peakBe Charge (Italy)

Be Charge Parco Alberto Sordi Cadriano

Via Cadriano 45/D, Granarolo dell'Emilia, IT

3 ports

Ports at this station

  • CCS2

    2× · up to 110 kW

    Available
  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
Via Cadriano 45/D, Granarolo dell'Emilia, BO, Italy
Total points
1
Coordinates
44.54836, 11.35659
Last verified
2024-10-26

About this stop

This Be Charge station at Parco Alberto Sordi Cadriano in Granarolo Dell'emilia has one CCS (Type 2) connector for most EVs and one tethered Type 2 connector. The station offers 110 kW peak rapid charging. It is currently operational.

EV charging in Granarolo Dell'emilia is covered by this single point. At 110 kW, a compatible EV can gain about 80 miles of range in 20 minutes, making it a viable stop for a quick boost on a journey. This power level is above the average for many public chargers, allowing for faster refueling when needed.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Be Charge Parco Alberto Sordi Cadriano.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Be Charge Parco Alberto Sordi Cadriano.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB