Burger King Mejorada
Calle Duratón, Mejorada del Campo, ES
5 ports · 0,45€/kWh DC50kW/AC43kW - 0,39€/kWh 22kW AC
Ports at this station
- Available
CCS2
2× · up to 50 kW
- Available
CHAdeMO
1× · up to 50 kW
- Available
Type 2 (tethered)
2× · up to 22 kW
Station info
- Address
- Calle Duratón, 28840, Mejorada del Campo, Comunidad de Madrid, Spain
- Total points
- 4
- Coordinates
- 40.38963, -3.49408
- Last verified
- 2025-10-09
About this stop
Burger King Mejorada offers EV charging in Mejorada Del Campo, Spain. Operated by Iberdrola, the station provides four charging points. Peak power reaches 50 kW for rapid DC charging, and there is also 22 kW AC charging available. Connectors include CCS (Type 2), CHAdeMO, and tethered Type 2. The station is currently operational.
This site is best suited for a quick charge while stopping, rather than a long top-up. 50 kW peak power can add about 100 miles of range to a typical EV in 30 minutes. The cost is 0,45€ per kWh for DC50kW/AC43kW charging and 0,39€ per kWh for 22kW AC charging.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Burger King Mejorada.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB