chargevu
3 of 3 available50 kW peakGrupo ICE

CoopeAgri

Avenida 6, Pérez Zeledón, CR

3 ports

Ports at this station

  • CCS1

    1× · up to 50 kW

    Available
  • CHAdeMO

    1× · up to 50 kW

    Available
  • GB/T DC

    1× · up to 50 kW

    Available

Station info

Address
Avenida 6, 11901, Pérez Zeledón, San José, Costa Rica
Total points
2
Coordinates
9.37602, -83.70262
Last verified
2021-05-06

About this stop

The CoopeAgri station in Pérez Zeledón, operated by Grupo ICE, offers 50 kW peak rapid charging. Drivers can connect using CCS (Type 1), CHAdeMO, or GB-T DC connectors. Two charging points are currently operational. This is a key EV charging in Pérez Zeledón for drivers needing a quick charge.

A 50 kW peak charging speed means adding about 100 miles of range to a typical EV in roughly 30 to 40 minutes, depending on the vehicle and its current battery level. This makes the CoopeAgri station a practical stop for road-trippers needing to replenish their battery or for local drivers requiring a substantial top-up rather than a full charge. It is a functional choice for charging needs in the area.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at CoopeAgri.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of CoopeAgri.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB