chargevu
0 of 9 available300 kW peakEnel X

Enel X AdS Q8

SP35 Km 135,810, Paderno Dugnano, IT

9 ports

Ports at this station

  • CCS2

    2× · up to 300 kW

    Unknown
  • CCS2

    2× · up to 50 kW

    Unknown
  • CHAdeMO

    1× · up to 100 kW

    Unknown
  • CHAdeMO

    2× · up to 50 kW

    Unknown
  • Type 2 (tethered)

    2× · up to 43 kW

    Unknown

Station info

Address
SP35 Km 135,810, Paderno Dugnano, MI, Italy
Total points
3
Coordinates
45.58886, 9.17298
Last verified
2022-06-10

About this stop

Enel X operates three ultra-rapid charging points at Paderno Dugnano, Italy. The station delivers up to 300 kW of peak power and offers CCS (Type 2), CHAdeMO, and Type 2 (Tethered Connector) options. This site provides EV charging in Paderno Dugnano for drivers needing a quick boost.

With 300 kW peak power, you can add approximately 100 miles of range in under 15 minutes, depending on your EV's charging speed. This makes it a practical stop for recharging during longer journeys or for a rapid top-up if you live or work nearby. The station is currently operational.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Enel X AdS Q8.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Enel X AdS Q8.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB