chargevu
0 of 3 available50 kW peakEnel X

Enel X Way Mongnod

Piazza Frutaz 25, Torgnon, IT

3 ports

Ports at this station

  • CCS2

    1× · up to 50 kW

    Unknown
  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • Type 2 (tethered)

    1× · up to 22 kW

    Unknown

Station info

Address
Piazza Frutaz 25, Torgnon, AO, Italy
Total points
1
Coordinates
45.80379, 7.56754
Last verified
2023-08-23

About this stop

This Enel X Way station in Torgnon, Italy, offers 50 kW peak rapid charging. It's equipped with CCS (Type 2), CHAdeMO, and a tethered Type 2 connector, catering to most EVs. The single charging point is currently operational. This station provides essential EV charging in Torgnon for drivers needing a quick power boost.

At 50 kW peak, a typical EV could gain around 100 miles of range in roughly 40 minutes, depending on the vehicle's battery and charging efficiency. This makes it a practical stop for topping up on longer journeys or for local drivers needing a substantial charge. Plan your route accordingly, as charging times can vary.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Enel X Way Mongnod.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Enel X Way Mongnod.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB