chargevu
3 of 3 available50 kW peakAllego BV

Leea Landeszentrum f. erneuerbare Energien GmbH

Kirschenallee 1, Neustrelitz, DE

3 ports

Ports at this station

  • Type 2 (tethered)

    1× · up to 43 kW

    Available
  • CHAdeMO

    1× · up to 50 kW

    Available
  • CCS2

    1× · up to 50 kW

    Available

Station info

Address
Kirschenallee 1, 17235, Neustrelitz, Landkreis Mecklenburgische Seenplatte, Germany
Access
Die Säule befindet sich auf dem Parkkplatz des Landeszentrums für Erneuerbare Energien Mecklenburg-Vorpommern (Leea) direkt neben der Ladesäule der Stadtwerke Neustrelitz.
Total points
3
Coordinates
53.36117, 13.09140
Last verified
2018-06-02

About this stop

Allego BV operates three rapid EV charging points in Neustrelitz, Germany. The station offers CCS (Type 2), CHAdeMO, and Type 2 (Tethered Connector) options. All charging points are currently operational.

With a peak power of 50 kW, this station is suited for topping up your battery during local travel or as a rapid stop. A 50 kW charger can add approximately 150 miles of range to a typical EV in about 30 minutes, depending on the vehicle's battery size and charging speed. This is a practical option for EV charging in Neustrelitz.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Leea Landeszentrum f. erneuerbare Energien GmbH.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Leea Landeszentrum f. erneuerbare Energien GmbH.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB