Parking O Progreso
Rúa do Progreso, 76, Ourense, ES
6 ports · 0,45€/kWh
Ports at this station
- Available
CCS2
4× · up to 60 kW
- Available
Type 2 (tethered)
2× · up to 22 kW
Station info
- Address
- Rúa do Progreso, 76, Ourense, Spain
- Total points
- 6
- Coordinates
- 42.34175, -7.86751
- Last verified
- 2025-12-21
About this stop
Iberdrola operates this public EV charging site at Parking O Progreso in Ourense, ES. It has six charging points. The chargers deliver up to 60 kW peak power. You can connect using CCS or a tethered Type 2 connector. The station is currently operational.
This is a good option for EV charging in Ourense. A 60 kW peak rate means most EVs can add around 100 miles of range in 30 to 40 minutes. This makes it a viable stop for longer journeys or a substantial top-up if you live or work nearby. The cost is 0,45€ per kilowatt-hour.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Parking O Progreso.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB