chargevu
6 of 6 operational50 kW peakOsprey Charging

Pepper Mill

Pepper Mill, Longton, GB

6 ports · £0.79/kWh

Ports at this station

  • CHAdeMO

    1× · up to 50 kW

    Operational
  • CCS2

    1× · up to 50 kW

    Operational
  • CHAdeMO

    1× · up to 50 kW

    Operational
  • CCS2

    1× · up to 50 kW

    Operational
  • Type 2 (tethered)

    1× · up to 43 kW

    Operational
  • Type 2

    1× · up to 22 kW

    Operational

Station info

Address
Pepper Mill, ST3 2JB, Longton, Stoke-on-Trent, United Kingdom
Total points
4
Coordinates
52.99083, -2.14553
Last verified
2024-07-30

How this site compares

In Longton

Highest peak power of 3 sites, shared with 1

2 of 3 sites with a known peak power reach 50 kW or more

In United Kingdom

Top 17% by peak power

Among 27,450 sites with a known peak power

Osprey Charging

373 sites across 339 cities in United Kingdom

All Osprey Charging sites in United Kingdom →

50 kW+ within 25 km

48 other sites, 7 at 150 kW or more

Nearest: Lidl-Trentham Road · 1.0 km · 50 kW · POD Point (UK)

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Pepper Mill.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Pepper Mill.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB