chargevu
4 of 4 available120 kW peakPLN (Indonesia)

PLN UP3 Banten Utara

PLN UP3 Banten Utara , , Jl Pangeran Diponegoro, Serang, ID

4 ports · IDR 2467/kWh ++

Ports at this station

  • Type 2 (tethered)

    2× · up to 7 kW

    Available
  • CCS2

    2× · up to 120 kW

    Available

Station info

Address
PLN UP3 Banten Utara , , Jl Pangeran Diponegoro, 42112, Serang, Banten, Indonesia
Total points
1
Coordinates
-6.11582, 106.15302
Last verified
2026-04-17

About this stop

This PLN-operated station in Serang, ID features a 120 kW rapid charger with CCS (Type 2) and a tethered Type 2 connector. It has one charging point and is currently operational. The cost is IDR 2467 per kWh plus other fees.

With 120 kW peak power, this station can add approximately 150 miles of range to a compatible EV in about 20 minutes. This speed makes it a useful stop for EV charging in Serang if you need a quick boost. It is better suited for longer trips where time is a factor, rather than a typical local overnight charge. Drivers should confirm compatibility of their vehicle's charging port with the available connectors.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN UP3 Banten Utara.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN UP3 Banten Utara.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB