chargevu
3 of 3 available25 kW peakPLN (Indonesia)

PLN UP3 Kaltara

PLN UP3 Kaltara, Jalan Jelarai, Kabupaten Bulungan, ID

3 ports · IDR2467/kWh

Ports at this station

  • CCS2

    1× · up to 25 kW

    Available
  • CHAdeMO

    1× · up to 25 kW

    Available
  • Type 2 (tethered)

    1× · up to 7 kW

    Available

Station info

Address
PLN UP3 Kaltara, Jalan Jelarai, Kabupaten Bulungan, Kalimantan Utara, Indonesia
Total points
1
Coordinates
2.83940, 117.38879
Last verified
2026-04-29

About this stop

PLN operates the UP3 Kaltara charging site in Kabupaten Bulungan. The single charging point offers CCS (Type 2), CHAdeMO, and a tethered Type 2 connector. Its peak power is 25 kW.

At 25 kW, this station provides slower AC charging. Expect to add about 8 to 10 miles of range per hour of charging. This makes it more suitable for topping up your battery while parked locally rather than for quick road trip stops. This is one option for EV charging in Kabupaten Bulungan.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at PLN UP3 Kaltara.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of PLN UP3 Kaltara.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB