chargevu
0 of 4 available50 kW peakEV Energy Group (FCN)

Southeastern EC

1519 US-70, Durant, US

4 ports

Ports at this station

  • Type 1 (J1772)

    2× · up to 3.7 kW

    Unknown
  • CHAdeMO

    1× · up to 50 kW

    Unknown
  • CCS1

    1× · up to 50 kW

    Unknown

Station info

Address
1519 US-70, 74701, Durant, OK, United States
Access
24 hours daily
Coordinates
33.99819, -96.35470
Last verified
2025-11-11

About this stop

Southeastern EC in Durant offers 50 kW rapid charging, suitable for drivers needing a quick power boost. The station is operated by EV Energy Group. It provides CCS (Type 1), CHAdeMO, and Type 1 (J1772) connectors. The number of charging points on site is unstated. This EV charging in Durant is currently operational.

A 50 kW peak charging speed means most EVs will add about 100 miles of range in 40 to 60 minutes, depending on the vehicle and battery temperature. This makes Southeastern EC a functional stop for topping up on longer journeys or for local drivers needing power. Its operational status indicates reliability for drivers planning a visit.

Nearby

6 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at Southeastern EC.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of Southeastern EC.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB