Southeastern Electric Cooperative - Francis Energy
1514 US-70, Durant, US
3 ports · $1.00/session+$0.21/minute
Ports at this station
- Available
CCS1
1× · up to 50 kW
- Available
CHAdeMO
1× · up to 50 kW
- Available
Type 1 (J1772)
1× · up to 8 kW
Station info
- Address
- 1514 US-70, 74702, Durant, OK, United States
- Access
- Use EVGateway App to manage charging
- Total points
- 2
- Website
- francis.energy
- Coordinates
- 33.99850, -96.35500
- Last verified
- 2024-02-09
About this stop
This Southeastern Electric Cooperative station in Durant offers 50 kW peak charging, suitable for drivers needing a rapid charge. Operated by Francis Energy, it has two charging points equipped with CCS (Type 1), CHAdeMO, and Type 1 (J1772) connectors. The station is currently operational.
At 50 kW peak, this station is a practical stop for EV charging in Durant, not just for local drivers but also for those on longer journeys. A 50 kW charger can add about 100 miles of range to a typical EV in roughly one hour, depending on the vehicle. The cost is $1.00 per session plus $0.21 per minute of charging.
6 closest stations
If this site is busy or out of service, here are the next best options within roughly 50 km.
No reviews yet. Be the first to tell other drivers what to expect.
Quick check-in
1 tap · rate-limited
Tell the next driver what to expect.
Add a photo of Southeastern Electric Cooperative - Francis Energy.
JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.
Drag a photo here, or click to pick one.
JPEG, PNG, WebP, HEIC up to 5 MB