chargevu
3 of 3 available100 kW peakOrlencharge

MOP Olsztynek Południe

MOP Olsztynek Południe, Czarci Jar, Drwęck, PL

3 ports

Ports at this station

  • CCS2

    1× · up to 100 kW

    Available
  • CHAdeMO

    1× · up to 50 kW

    Available
  • Type 2 (tethered)

    1× · up to 22 kW

    Available

Station info

Address
MOP Olsztynek Południe, Czarci Jar, 11-015, Drwęck, powiat olsztyński, Poland
Total points
1
Coordinates
53.58220, 20.18130
Last verified
2020-08-07

About this stop

Orlencharge operates this rapid EV charging site at MOP Olsztynek Południe in Drwęck. The station offers 100 kW peak power through a single charging point. Connectors available include CCS (Type 2), CHAdeMO, and a tethered Type 2 connector. This location is currently operational for EV charging in Drwęck.

A 100 kW peak output means this station can add approximately 100 miles of range to a compatible EV in about 20 to 30 minutes, depending on the vehicle. It is primarily suited for road trip charging stops rather than extended dwell times. Plan your charging stops accordingly when traveling through the area.

Nearby

5 closest stations

If this site is busy or out of service, here are the next best options within roughly 50 km.

Reviews

No reviews yet. Be the first to tell other drivers what to expect.

Anonymous review

Tell other drivers what happened at MOP Olsztynek Południe.

No account. No email harvested. Captcha is used to keep spammers out.

By submitting you confirm this is your own experience. We rate-limit 1 review per IP per station per 24 hours.

Quick check-in

1 tap · rate-limited

Tell the next driver what to expect.

Photo

Add a photo of MOP Olsztynek Południe.

JPEG, PNG, WebP or HEIC, 5 MB max. EXIF is stripped on our side. Photos appear after a quick moderation pass.

Drag a photo here, or click to pick one.

JPEG, PNG, WebP, HEIC up to 5 MB